Skip to dashboard content

OMNIHEALTHAI · EAII SECOND COHORT

EAII MVP Dashboard

A practical path from a synthetic demonstration to a measured, human-supervised Ethiopian healthcare pilot.

Demonstration and pilot-planning stage · institutional validation pending

OMNIHEALTHAI · EAII COHORT 2 · DEDICATED MVP WORKSPACE

One pilot. Measurable evidence.

Clinical AI safety and workflow evaluation for Ethiopian institutions. Start with one hospital department and a university evaluation partner.

Planning and synthetic demonstration stage. Pilot results, funding and institutional partnerships are not yet verified.

Recommended first product

An evaluation workbench that checks AI-generated workflow drafts for omissions, unsupported claims and review requirements. Clinicians make all care decisions. Expand to research evidence workflows after this pilot demonstrates value.

First buyer: a hospital quality or medical-director team with an identified budget. First independent evaluator: university faculty. EAII can help facilitate introductions, technical review and an eligible funding route; these are requests, not confirmed commitments.

SESSION-ONLY PLANNING TOOL

Build the one-page pilot scope

Turn the orientation request into a reviewable scope. Use synthetic, non-personal information only. Nothing is saved to an account or sent to an institution.

Draft — 11 core items missing

Readiness check

Still missing: legal applicant organisation, hospital or institution, hospital department, clinical champion role, budget owner role, independent university, independent evaluator role, approved or public source pack, prospective protocol reference, baseline timing method, acceptance rule.

Exported text is editable and not a signature, approval or durable audit record.

Institution entry points

Hospital

One department: evaluate AI-generated documentation and referral drafts on synthetic cases.

Owner: Medical director + quality lead

Measure: Review time, critical omissions, unsafe recommendations

University

Faculty-led independent evaluation and English/Amharic usability testing.

Owner: Dean + research ethics lead

Measure: Reviewer agreement, citation validity, language error rate

Research institute

Protocol and site-feasibility evidence workflow using public or approved materials.

Owner: Research director + principal investigator

Measure: Preparation time, source traceability, correction rate

Ministry of Health / regional bureau

Assess aggregate reporting quality and digital-health alignment after a successful pilot.

Owner: Digital-health lead + programme owner

Measure: Reporting time, completeness, reconciliation errors

Professional association / NGO

Evidence summaries and supervised continuing education.

Owner: Programme director

Measure: Useful outputs, review burden, renewal intent

Eight-week execution plan · proposed

Days 1–7 · Dr. Kalid + EAII liaison

Secure one clinical champion, one university evaluator and a budget owner; agree one workflow and a written pilot scope.

Days 8–14 · Engineering + clinical lead

Use synthetic cases; define reviewer rubric, baseline timing, model/version log, sources and stop rules. Confirm English/Amharic requirements.

Days 15–28 · Two independent clinical reviewers

Evaluate a proposed 50–100 representative cases, stratified by risk and language. Adjudicate disagreements and record failures.

Days 29–42 · Institutional pilot team

Run supervised shadow evaluation only after governance review; compare manual and assisted workflows on equivalent tasks.

Days 43–56 · Founder + budget owner

Deliver evidence report, cost per accepted output, security review and a scoped paid-pilot or renewal proposal.

Proposed success contract

Measure median preparation time and total time including review. Target at least 20% lower total task time, 100% traceable material claims and zero unresolved critical safety failures in the evaluated sample. Report denominators, confidence intervals and all failures; these targets are not achieved results and do not establish clinical safety.

Stop the affected workflow for a critical unsafe output, data exposure or broken review gate. Resume only after documented repair and independent review.

Next milestone: one scoped institution pilot with independent evaluation.

Discuss a pilot